PAY YOUR BILL
REPORT A PROBLEM
Press Release
PWSA PAVING SCHEDULE
September 11 – September 15, 2017

Pittsburgh, PA - The Pittsburgh Water and Sewer Authority (PWSA) contractors are scheduled to complete surface restoration, which includes paving and concrete work for the week of September 11, 2017. Many work locations will require restricted parking while work is being performed. Signs will be posted in advance and removed as soon as possible.

 

*Please note that the schedule is weather dependent and subject to change.

 

Work locations are as follows:

 

128 South 15th Street

81 South 16th Street

188 South 17th Street

South 17th Street at Sarah Street

1710 Fox Way

1715 Jane Street

1715 Mary Street

152 South Mary Street

2330 Sidney Street

South 20th at East Carson Street

 

*Any customer who needs additional information should call PWSA Emergency Dispatch 24/7 at 412.255.2423.

 

-=-

 

  • Published
  • Friday, September 8, 2017

  • Tools
  •  
  •  
  •