PWSA PAVING SCHEDULE
August 26 - August 30, 2019

Pittsburgh, PA - The Pittsburgh Water at Sewer Authority (PWSA) contractors are scheduled to complete surface restoration, which includes paving at concrete work for the week of August 26 – August 30, 2019. Many work locations will require restricted parking while work is being performed. Signs will be posted in advance at removed as soon as possible.

 

*Please note that the schedule is weather dependent at subject to change.

 

Work locations are as follows:

 

 

6900 block Kelly Street
6934 Kelly Street
Mount Vernon Street
6918 Kelly Street
6960 Monticello Street
6914 Kelly Street
Fort Pitt Boulevard at Stanwix Street
Lauch Way 
Inwood Street
346 Merritt Avenue
1000 block Beecher Street
1014 Lincoln Avenue
910 Gerrit Street
1200 Stedman Street
1009 Gerrit Street
1315 Arch Street
7037 Fielding Way
River Avenue at Chesbro Street
610 North Murtland Street
River Avenue at Veterans Bridge 
540 North Murtland Street
905 James Street at Suismon Street 
North Dallas Avenue at Kelly Street
512 Dunloe Avenue
Fort Pitt Boulevard at Stanwix Street
1181 Damas Street
1003 Beecher Street
1334 Diana Place
1027 Beecher Street
Hunnell Street at Erk Way
1514 North Lang Avenue
83 Solar Street 
808 Inwood Street
1133 Brabec Street
800 Inwood Street
58 Rostock Street
826 Inwood Street
1334 Brabec Street
828 Inwood Street
1214 Haslage Avenue
834 Inwood Street
1828 Ley Street
838 Inwood Street
Mifflin Road 
842 Inwood Street
 
846 Inwood Street
 
857 Inwood Street
 
883 Inwood Street
 
885 Inwood Street
 
856 Inwood Street
 
7039 Fielding Way
 
7025 Fielding Way
 
6909 Kelly Street
 
6911 Kelly Street
 
6927 Kelly Street
 
6933 Kelly Street
 
6935 Kelly Street
 
885 Inwood Street

 

 

 

Any customer who needs additional information should call PWSA Emergency Dispatch 24/7 at 412.255.2423.

 